• fkec recently Membership with the Professional Associations

    fkec recently Membership with the following Professional Associations: 1. International Association for Impact Assessment…

    know more

    FKEC New Website Launch

    we updated our website so the employees can downloads all applications online

    know more
Go To Webmail
Downloads
  1. IT+
    Transport+
    HR+
    Procurement+
    Recruitment+
Study and Design of Urgent Hajj Projects for the Year 1445H
Location of Project

Makkah - Makkah

Client

National Water Company

Consultant Name

Fouad Al Saleh & Khaled Al Dhowalia Co. Environmental & Engineering Consultants

Contractor Name

undefined

Start Date

21/08/2023

End Date

20/12/2023

Amount of Project

2,996,500

About This Project+

Conducting necessary studies and designs through field visits, research, evaluation, and delivering a comprehensive technical report, paper and electronic, for all lines, sites, and projects within the scope of the contract, and based on the strategic plan for the Western Sector, in accordance with the relevant local and international codes and standards. Inspection and testing requirements based on the practical condition and deterioration mechanisms. The potential risks and required testing techniques that will be adopted according to the approved methodology presented and according to the schedule, as well as the human resources, materials and equipment used in conducting the tests in order to determine the defects of the existing pipelines and the future operational status of each line and project.

Projects within the scope of the contract include:

  • - Design project to support the supply of the areas served by the Al-Qusour Reservoir.
  • - Design project to support Muzdalifah emergency management networks.
  • - Raising the efficiency and capacity of an iron tank in Al-Mashaer - Al-Muaisem 90 (capacity 190,000 m3), part of (the design project for the second part of the main distribution lines in Mina (the second phase includes operational storage)).
  • - Design to increase capacity of the sewage network in Mina - the first group, including network of the lines 2,400 and 2,500 at the Fourth Ring Road.
  • - Design to increase capacity of the sewage network in Mina - Second group.
  • - Design to increase capacity of the sewage network in Mina - Third group.
Hide Sitemap
Show Sitemap
© 2024 FKEC, Fouad Al Saleh & Khaled Al Dhowalia Co. Environmental & Engineering Consultants. All rights reserved | Terms of Use